Bursa Announcements
Date : 08 June 2017

OTHERS SAPURA ENERGY BERHAD (FORMERLY KNOWN AS SAPURAKENCANA PETROLEUM BERHAD) - AWARD OF CONTRACTS

SAPURA ENERGY BERHAD

Type Announcement
Subject OTHERS
Description
SAPURA ENERGY BERHAD (FORMERLY KNOWN AS SAPURAKENCANA PETROLEUM BERHAD) 
- AWARD OF CONTRACTS

INTRODUCTION

The Board of Directors of Sapura Energy Berhad ("Sapura Energy" or the “Company") (“Board”) is pleased to announce that its direct and indirect wholly-owned subsidiaries have been awarded contracts with a combined value of approximately USD205.96 million (approximately RM879.01 million, based on USD/MYR exchange rate of USD1 : RM4.27).

Details of each of these contracts ("Contracts") and subcontract works ("Subcontract Works") are as summarised below:

ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION ("EPCI") OF WELLHEAD PLATFORMS, ASSOCIATED PIPELINES AND TIE-INS FOR ZAWTIKA DEVELOPMENT PROJECT PHASE IC (“PROJECT”)

Sapura Offshore Sdn. Bhd. (formerly known as SapuraKencana TL Offshore Sdn. Bhd.) has been awarded a Subcontract Works (as defined below) by PT. Gunanusa Utama Fabricators (“PTG”). PTG is the Main Contractor and PTTEP International Limited is the Client for this Project.

The Subcontract Works consists of EPCI of associated pipelines, transportation and installation of new offshore wellhead platforms, brownfield modifications of existing platforms and  installation of telecommunication and control system integrated to existing facilities to be executed in the Zawtika Field Development for Lot 1 and Lot 2 located in the Gulf of Moattama, approximately 300 km South of Yangon, Myanmar and 290 km West of Tavoy on the Myanmar Coast at an average water depth of approximately 120-160 meters. The Subcontract Works are expected to be completed in March 2018.

UPGRADE OFFSHORE SINGLE POINT MOORING (“SPM”) REPLACEMENT BY BRUNEI SHELL PETROLEUM CO SDN BHD (“BSP”)

Sapura Offshore Sdn Bhd has been awarded a contract to undertake the works for The Seria Crude Oil Terminal (“SCOT”) Oil Export System (“OES”) Upgrade Offshore Single Point Mooring (“SPM”) Replacement (as defined below) by Brunei Shell Petroleum Co Sdn Bhd (“BSP”).

The Contract scope of works consists of project management, engineering, procurement, fabrication, transportation and installation and hook-up/pre-commissioning of one of BSP’s new Single Point Mooring-1 (“SPM-1”) and Pipe Line End Manifold-1 (“PLEM-1”) complete system as well as decommissioning of certain parts of existing infrastructure for the project. The duration of the overall works will be approximately twenty one (21) months with the offshore works planned to commence in April 2018.

TRANSPORTATION AND INSTALLATION BALANCE SUBSEA WORKS FOR OIL AND NATURAL GAS CORPORATION LIMITED, INDIA

Sapura Offshore Sdn Bhd has been awarded a contract to undertake transportation and installation (“T&I”) balance subsea works (as defined below) for Oil and Natural Gas Corporation Limited.

The Contract scope of work comprises of T&I balance subsea works for C26 Cluster Pipeline Project at ‘C-24PI to TCPP’ segment and ’BB to BA’ segment, relocation of anodes at NLW platform. The scope also includes sump caisson removal at BA platform and to divert the flow to inlet of closed drain header at BPA platform. The offshore works are expected to be completed by second quarter of 2017.

PROVISION OF INSPECTION, REPAIR AND MAINTENANCE ("IRM") SERVICES TO PTTEP AUSTRALASIA (ASHMORE CARTIER) PTY LTD (“PTTEP AUSTRALASIA”)

Normand Sapura Pty Ltd has been awarded a Contract to undertake the work (as defined below) by PTTEP Australasia.

The Contract is for the provision of IRM services including saturation diving and remotely operated vehicle (ROV) intervention works in Montara field.

The work is expected to be completed by July 2017.

FINANCIAL EFFECTS

The Subcontract Works and Contracts announced herein will have no effect on the issued and paid-up capital of the Company and are expected to contribute positively towards the earnings of Sapura Energy Group principally for the financial year ending 31 January 2018 for Subcontract Works and Contracts that extend beyond 31 January 2018, and the financial period(s) thereafter within the duration of the Subcontract Works and Contracts and the extension periods if the extension options are exercised.

RISK FACTORS

Risk factors affecting the Subcontract Works and Contracts including execution risks such as availability of skilled manpower and materials, changes in pricing, weather conditions and/or political, economic and regulatory conditions. Notwithstanding, the Group has established a successful track record undertaking similar projects.

DIRECTORS AND MAJOR SHAREHOLDERS' INTEREST

None of the Directors and/or major shareholders of the Company and/or persons connected with them have any direct or indirect interest in the award of the Subcontract Works and Contracts herein.

DIRECTORS’ STATEMENT

The Board is of the opinion that the acceptance of the Subcontract Works and Contracts are in the best interest of the Company.

This announcement is dated 8 June 2017.






Announcement Info

Company Name SAPURA ENERGY BERHAD
Stock Name SENERGY
Date Announced 08 Jun 2017
Category General Announcement for PLC
Reference Number GA1-07062017-00046


Back